Process
Six stages, in this order, every time
You always know which stage you are in, what it costs and what comes next.
- Stage 1
Brief
We sit with you, walk the site and write down what the building has to do.
- Stage 2
Design proposal
Concepts, scope and a fee schedule on a single sheet you can read in one sitting. Design work is mobilised with 70% of the design fee, it covers our whole design team, not just the architect.
- Stage 3
Approval
You approve, or you ask for changes. We revise until the design matches the brief.
- Stage 4
Mobilisation: 30% to start construction
Once your design is approved and you are ready to build, a 30% mobilisation payment under a formal agreement secures your team and materials.
- Stage 5
Construction
We build, and we post photographs and a note from site so you can see the week's work.
- Stage 6
Handover
Keys, drawings, accounts and maintenance notes, assembled into one pack.
Our construction week runs Monday to Saturday; you receive your update when the week actually ends.
Questions we are asked
- How are fees structured?
- In two parts. The design fee is 70% upfront: design carries the risk, and that payment mobilises our whole design consortium, architect, structural engineer and allied professionals. Construction is mobilised separately with 30% under a formal agreement; the rest follows the milestones.
- Why is construction mobilisation 30%?
- Thirty per cent buys the first tranche of materials at today's price and pays the team that opens the site. It is stated in the agreement before you sign anything.
- Do you handle approvals?
- Yes. Statutory approvals and documentation are part of our consultancy and design service.
- Can I build in stages?
- Yes. We design the whole building and can phase the construction to your budget.
- Can I use my own structural engineer?
- Yes, we work happily alongside professionals you already trust.
- How do I follow the work from abroad?
- Your Studio shows the building section, the week's photographs and every payment. We also send a Saturday summary on WhatsApp, when the construction week ends.